Bituminous Plant Guidelines

Posted by aditya | 4:47 PM | | 1 comments »




◊ Accurate proportioning of cold feed aggregates
---> To ensure proper blened of materials to meet predetermined JMF
---> To ensure the proper balance of material in the hot bins
◊ Scales zero properly and record accurately
---> Scale lever systems kept clean
---> Load cells of the proper size, properly aligned and hanging free
◊ Asphalt bucket tared properly and hanging free
◊ Aggregate weight box tared properly and hanging free
◊ Mixer condition and function
---> Mixer part in a good condition and adjusted to the proper mixing pattern
---> Proper size batch being mixed
◊ Sufficient mixing time for dry and wet cycles
◊ Uniform asphalt and aggregate distribution in the pugmill
◊ Proper aggregate and asphalt temperature when these materials are introduced into weighing receptacles
◊ Worn or damage screen
◊ Moisture content of the aggregate after it leaves the dryer
◊ All proper safety requirements being met.

Title Post: Bituminous Plant Guidelines
Rating: 100% based on 99998 ratings. 5 user reviews.
Author: aditya