Traffic flow conflict settings

Posted by aditya | 3:11 PM | , | 0 comments »



Conflict setting traffic flow at a crossroads can be done by changing / separation time. Setting change / separation of traffic flow is known as phasing. The use and selection of the phases seen in the main conflict between the North-South traffic flow and the East-West. Because there are two major conflicts, then it can be solved with 2-phase. If at an intersection there are three major conflicts, then the 3-phase can be completed. These circumstances because of the two currents which veer to the right a little large on one approach, so that there are three major conflicts; as well if there are four major conflicts at intersections, can be overcome by using 4-phase system


Bookmark and Share

Title Post: Traffic flow conflict settings
Rating: 100% based on 99998 ratings. 5 user reviews.
Author: aditya

0 comments