Batch Hot Mixture Asphalt Plant (PART 2)

Posted by aditya | 4:28 PM | | 2 comments »


◊ After screening the aggregates, they are stored in hot material bins. The stored aggregates are later proportioned to produce the bituminous mixture.
◊ The finest material is separated first into a bin by a vibrating screen; oversize material is caught by a scalping screen and discharged from the tower. Other material sizes are separated by vibrating screens and stored in the remaining bins.
◊ The control system then proportions the hot aggregates from the bins into the weigh box which is mounted on a set of scales.
◊ These dry aggregates are discharged into the pugmill and the hot bitumen, which has been weighed and stored in a weigh bucket, is sprayed into the pugmill after a few seconds of dry mixing.

Title Post: Batch Hot Mixture Asphalt Plant (PART 2)
Rating: 100% based on 99998 ratings. 5 user reviews.
Author: aditya

2 comments

  1. Anonymous // April 22, 2023 at 4:39 PM  
  2. FABHIND // March 18, 2024 at 5:02 PM  

    Thank you for sharing this useful information.

    Asphalt plant